Weston Public School
This project involved upgrades to Weston Public School for Bovis Lend Lease Pty Ltd.
Weston Public School Read More »
This project involved upgrades to Weston Public School for Bovis Lend Lease Pty Ltd.
Weston Public School Read More »
North undertook an 11 bed extension to Woy Woy Community Care’s Residential Aged Care Facility along with an extension to the Dining room, Activities area, new Staff Training areas. A single storey development, it was constructed using full masonry walls and trussed roof marrying into the existing facility, an upgrade of the external areas and
Woy Woy Aged Care Facility Read More »
The Woy Woy Oval Grandstand project consisted of a new 600 seat Grandstand with spacious change rooms for both Rugby League and Rugby Union, storage areas, public amenities, canteen and club rooms. In addition to the Grandstand was a separate 100m2 cafe building and significant hard and soft landscaping packages to complete the upgrade of
Woy Woy Oval Grandstand Read More »
With existing facilities dating back 80 years, St David’s Presbyterian Church (now Woy Woy Presbyterian Church), was desperately in need of modern facilities to grow its congregation while maintaining the heritage that the existing facilities encompassed. The new building comprises subfloor blockwork, a suspended duragal framed timber floor, exposed structural steelwork that mirrored the shape
Woy Woy Presbyterian Church Read More »
The construction of a 132kV to 11kV Zone Substation in the Charlestown area allowed for the decommissioning of the aged existing 33/11kV Charlestown ZS and Dudley ZS. The new electricity substation included the construction of a double storey 11kV substation building and outdoor 132kV switchyard. This project was completed on a steep site with numerous
Ausgrid Charlestown Read More »
The Project entailed the construction of a new, purpose built facility for the short term treatment of patients who have presented at the Emergency Department and need urgent care or treatment prior to being admitted to a ward within the Hospital. This project also involved the refurbishment of multiple areas within the existing Emergency Department.
Wyong Hospital Emergency Department Short Stay Unit and Urgent Care Centre Read More »
The constraints of building at the entrance to a functioning school on a steeply sloping site provided many challenges in both design and construction of this project. An alternate construction sequence proposed by North allowed the school to use the existing driveway until the new access was built, with the changeover occurring during the school
Mater Maria Catholic College – Warriewood Read More »
Berowra Christian Community School is a small K-6 Primary School, established by Berowra Baptist Church in 1986. North’s association here began with the construction of new education facilities in 2002. The project was won at competitive tender and consisted of a 2 storey classroom building extension to the existing school. Testament to the success of
Berowra Christian Community School Read More »
Brooklyn Rural Fire Service located in Brooklyn was a fit out and refurbishment project extending over 20 weeks at a value of $800,000. North worked diligently with the Hornsby Shire Council in all stages of the project to ensure the fire station would meet industry standards. DURATION 20 weeks
Brooklyn Fire Station Read More »
The East Lindfield Sub-transmission Switch project involved the rock excavation and concrete construction of a 4 level insitu building and roof on a steep site at Lindfield built adjacent to the existing 132kV covered switch yard. The new building houses the new 132kV circuit breakers along with the switch/control room and associated equipment. Unique features